- All colors of acrylic acid laminated spring special paints
- acrylic acid resin paints
- All colors of polyurethane magnetism paints
- All colors of polyurethane orange paints
- Amino resin paints
- Nitro- paints
- Epoxy resin paints
- Alcohol acid resin paints
- All colors of vehicle special paints
- All colors of self-drying hammer paints
- Ultrawhite fast drying aluminium powder paints
- Acrylic acid road making paints
- Solvent based acrylic acid exterior wall and encaustic tile paints
- Terrace paints
- Industrial corrosion resistant paints
- All colors of aliphatic series acrylic acid polyurethane magnetism paints
- Organic silicon temperature resistant paints
- All colors of metal flashing paints( double components)
- Fluorous carbon paints
- Steel special paints
- Accessory materials
- Construction guide

Painting process
First , waether conditions
1, The operating temperature should be above 0?, the relative moisture should be under 70%.
2, Above 30?. Be close to the surface.
Second, Before painting
1, Check all the paints.
2, Learn about the primary performance and operating methods.
3, it is made up of all kinds of conponents.
4, Mixture before using and after 20 mins, it can be used.
5, The storage time is the minimum limit.
Third, Paintings
1, brush coating
When paints brush coating,brush down and the direction should be about the direction of thecoatings.
2, The oil in drum should distribute evenly..
3, High pressure airless flame plating
This is the fastest coating method and the paints film is thick.
4, The controlling of the thickness of the paints films
The paints film thickness are all dry paints film thickness .
5, Coating
It should be opreated according to different coating varieties.
6, It is the theological value of the amount.The detail amount should be determined according to the details conditions..
1, The operating temperature should be above 0?, the relative moisture should be under 70%.
2, Above 30?. Be close to the surface.
Second, Before painting
1, Check all the paints.
2, Learn about the primary performance and operating methods.
3, it is made up of all kinds of conponents.
4, Mixture before using and after 20 mins, it can be used.
5, The storage time is the minimum limit.
Third, Paintings
1, brush coating
When paints brush coating,brush down and the direction should be about the direction of thecoatings.
2, The oil in drum should distribute evenly..
3, High pressure airless flame plating
This is the fastest coating method and the paints film is thick.
4, The controlling of the thickness of the paints films
The paints film thickness are all dry paints film thickness .
5, Coating
It should be opreated according to different coating varieties.
6, It is the theological value of the amount.The detail amount should be determined according to the details conditions..