Exterior wall of mosaic and ceramic tile:
No.
|
Working
procedure
|
Materials
to be used
|
Method
of application
|
Remarks
|
1
|
Surface
cleaning
|
Thin
oxalic acid, water
|
Washing
|
Clean
the surface with thin axalic acid, and then
wash with fresh water.
|
2
|
Scraping
with filler
|
Special
filler for ceramic tile
|
Scrape
2-4 coats of filler
|
When
the wall surface is dry completely, scrape
the first coat of filler on the ceramic tile
surface of exterior wall. Every 24 hours
after drying, scrape one coat again. In
general, it needs 2-4 coats to obtain smooth
surface without obvious brick seams.
|
Filler
for mill finish of exterior wall
|
Scrape
2 coats of filler
|
After
the filler on the ceramic tile surface is
dry for 48 hours, scrape the first coat of
filler on the mill surface of exterior wall.
After the first coat is dry for 24 hours,
then scrape the second coat of filler.
|
3
|
Surface
abrading
|
Abrasive
paper
|
Abrading
|
When
the filler is dry,
the surface should be rubbed flat
with fine abrasive paper.
|
4
|
Sealer
|
OUP
FPP502 Epoxy sealer; Suitable
thinner: OUP103
|
Roller
|
If
need, adjust the viscosity of application
with OUP103. Paint
one coat of sealer with roller. |
5
|
Finish
|
OUP
EWP1501 One package acrylic rubber paint for
exterior wall; Suitable thinner: OUP108
|
Brush,
roller or spray
|
When
the sealer is dry (In general, at 25oC,
it takes over 12 hours to dry), paint two
coats of finish. The second coat should be
conducted after the first one is surface
dry. Adjust the viscosity with
suitable thinner to the conditions of
application.
|
OUP
EWP1502 Two components aliphatic acrylic
polyurethane paint for exterior wall;
Suitable thinner: OUP104
|
Brush,
roller or spray
|
SFCP1101
Fluorocarbon finish; Suitable thinner:
OUP112
|
Brush,
roller or spray
|
For
Cement mortar troweling wall:
No
|
Working
procedure
|
Materials
to be used
|
Method
of application
|
Remarks
|
1
|
Surface
cleaning
|
Remove
the loose or bulgy cement mortar polymer.
Fill and leave up with cement mortar or
resin mortar.
|
2
|
Surface
abrading
|
Filler
for mill finish of exterior wall, or
flexible crack- resistant filler for mill
finish of exterior wall
|
Scrape
two coats of filler
|
When
the wall surface is dry completely, scrape
the first coat of filler. After the first
coat is dry for 24 hours, then scrape the
second coat of filler.
|
3
|
Scraping
with filler
|
Abrasive
paper
|
Abrading
|
When
the filler is dry,
the surface should be rubbed flat
with fine abrasive paper.
|
4
|
Sealer
|
OUP
FPP502 Epoxy sealer; Thinner: OUP103
|
Roller
|
If
need, adjust the viscosity of application
with OUP103. Paint one coat of sealer with
roller.
|
5
|
Finish
|
OUP
EWP1501 One package acrylic rubber paint for
exterior wall Thinner: OUP108
|
Brush,
roller or spray
|
When
the sealer is dry (In general, at 25oC,
it takes over 12 hours to dry), paint two
coats of finish. The second coat should be
conducted after the first one is surface
dry. Adjust the viscosity with
suitable thinner to the conditions of
application.
|
OUP
EWP1502
Two components aliphatic acrylic
polyurethane paint for exterior wall; Thinner:
OUP104
|
Brush,
roller or spray
|
SFCP1101
Fluorocarbon finish; Thinner:
OUP112
|
Brush,
roller or spray
|
|
|
|
|