Exterior wall of mosaic and ceramic tile:

No.

Working procedure

Materials to be used

Method of application

Remarks

1

Surface cleaning

Thin oxalic acid, water

Washing

Clean the surface with thin axalic acid, and then wash with fresh water.

2

Scraping with filler

Special filler for ceramic tile

Scrape 2-4 coats of filler

When the wall surface is dry completely, scrape the first coat of filler on the ceramic tile surface of exterior wall. Every 24 hours after drying, scrape one coat again. In general, it needs 2-4 coats to obtain smooth surface without obvious brick seams.

Filler for mill finish of exterior wall

Scrape 2 coats of filler

After the filler on the ceramic tile surface is dry for 48 hours, scrape the first coat of filler on the mill surface of exterior wall. After the first coat is dry for 24 hours, then scrape the second coat of filler.  

3

Surface abrading

Abrasive paper

Abrading

When the filler is dry,  the surface should be rubbed flat with fine abrasive paper.

4

Sealer

OUP FPP502 Epoxy sealer; Suitable thinner: OUP103

Roller

If need, adjust the viscosity of application with OUP103. Paint one coat of sealer with roller.

5

 Finish

OUP EWP1501 One package acrylic rubber paint for exterior wall; Suitable thinner: OUP108

Brush, roller or spray

When the sealer is dry (In general, at 25oC, it takes over 12 hours to dry), paint two coats of finish. The second coat should be conducted after the first one is surface dry.  Adjust the viscosity with suitable thinner to the conditions of application.

OUP EWP1502 Two components aliphatic acrylic polyurethane paint for exterior wall; Suitable thinner: OUP104

Brush, roller or spray

SFCP1101 Fluorocarbon finish; Suitable thinner: OUP112

Brush, roller or spray

  For Cement mortar troweling wall:

No

Working procedure

Materials to be used

Method of application

Remarks

1

Surface cleaning

Remove the loose or bulgy cement mortar polymer. Fill and leave up with cement mortar or resin mortar.

2

Surface abrading

Filler for mill finish of exterior wall, or flexible crack- resistant filler for mill finish of exterior wall

Scrape two  coats of filler

When the wall surface is dry completely, scrape the first coat of filler. After the first coat is dry for 24 hours, then scrape the second coat of filler. 

3

Scraping with filler

Abrasive paper

Abrading

When the filler is dry,  the surface should be rubbed flat with fine abrasive paper.

4

Sealer

OUP FPP502 Epoxy sealer; Thinner: OUP103

Roller

If need, adjust the viscosity of application with OUP103. Paint one coat of sealer with roller.

5

Finish

OUP EWP1501 One package acrylic rubber paint for exterior wall Thinner: OUP108

Brush, roller or spray

When the sealer is dry (In general, at 25oC, it takes over 12 hours to dry), paint two coats of finish. The second coat should be conducted after the first one is surface dry.  Adjust the viscosity with suitable thinner to the conditions of application.

OUP EWP1502    Two components aliphatic acrylic polyurethane paint for exterior wall; Thinner: OUP104

Brush, roller or spray

SFCP1101 Fluorocarbon finish; Thinner: OUP112

Brush, roller or spray

Tel:0510-6321359,0510-6320807
Fax:0510-6324000
P.C.:214413

Webmaster
Add:Gushan town, Jiangyin, Jiangsu province