|
Stainless steel pipes 1, Main equipments
2, Main materials and energy consumption
Project introduction: This project was approved by Nanxun district environment protection bureau (XHR [2007] 98) under the environmental evaluation report edited by Zhejiang province industry environment protection designing research institute in May, 2007. This project was built from July, 2007 to October, 2007, and was put into trial production since October, 2007. It has been put into industrial production now. During the period of trial production, we operated this project strictly following the standard of environment protection. Huzhou Environment Protection and Monitoring Center Station made related environment inspections in December, 2007, and got such conclusion as following: 1,200 T/A of Stainless steel pipe technological innovation project can meet the environmental requirements. We look forward to your cooperation and business! Related documents: |
Copyright(C)2010,Huzhou Kangrun Chemical Co.,Ltd. All Rights Reserved. Supported by ChemNet ChinaChemNet Toocle Copyright Notice |